5/26/2023 0 Comments Buku tentang teknik sipil![]() ![]() The results show that the degree of saturation (DJ) of existing (in 2018) on Wednesday, North approach is 1.45, South 1.35, West 0.76, East 1.49 and existing DJ on Sunday approaching North 0.80, South 0.88, West 0.69 and East 1.12. Data retrieval in one day of weekday and one day of weekend. While secondary data in this study are population data, vehicle growth data, and traffic data from CCTV. Primary data in this study are traffic volume, intersection geometric conditions, and cycle times. For analyzing intersection traffic performance using Indonesian Road Capacity Guidelines method (PKJI 2014). The aim of this study is to determine the intersection performance in existing conditions and the next 5 (five) years and give a recommendation for improving an intersection performance. Raya Panjang Jiwo intersection is an intersection that has a high density level, especially at peak hour, it can be seen from the length of the queue.
0 Comments
Leave a Reply. |